White-Label Post-Production · United States

Video Editing Services That Clear Your Edit Queue
For US videographers and studios

Eterna Edits is the white-label video editing company behind videographers who shoot more than they can cut, and the wedding video editing outsourcing partner for studios across the United States. Send us the footage, keep your name on the delivery, and get wedding films back in your own style from 7 days, at published prices from $249.
No card. No sales call. A fixed price and a delivery date in writing before anything starts.

4.4 / 5

From 160 client reviews

4,000+

Projects delivered

300+

Videographers & studios

100%

White label + NDA on request

What We Edit

Our Video Editing Services

Our video editing services cover every format you shoot, under one post-production team. Eterna Edits handles the cut, the color, the sound and the delivery files, so you can stay on set instead of at the timeline. Weddings are the specialism and the bulk of our work; everything else below is edited by the same team to the same standard. Every project comes back white-labelled and ready to send to your client.
01

Wedding & Event Films

Cinematic highlights, short films, documentaries, ceremony and reception reels. By volume this is most of what we do, and most US wedding studios come to us to outsource wedding video editing outright — see the full wedding video editing services.
02

Brand & Corporate Video

Company films, testimonials, event recaps, internal comms and training content cut to your brand guidelines. More on corporate video editing.
03

YouTube & Long-Form

Talking-head edits, vlogs, podcasts and tutorials with pacing, b-roll, captions and thumbnails. See YouTube video editing.
04

Social & Short-Form

Vertical cuts for Reels, Shorts and TikTok, pulled from your existing long-form footage with captions and hooks built in. Made for content creators.
05

Product & E-Commerce

Demo videos, unboxings and ad cutdowns in multiple aspect ratios, built to drop straight into a paid campaign. Part of our video editing for business.
06

Photo Editing & Retouching

Culling, color and retouching delivered alongside the film, so the gallery and the video match. See photo editing and retouching.

The Full Post Stack

Video Post Production Services

Editing is one stage of post. Eterna Edits covers the rest of the pipeline too, so a finished film leaves one studio instead of being passed between three freelancers.

Colour Grading

Shot matching across cameras, LUT-accurate grades and skin-tone correction in DaVinci Resolve. See color grading and color correction.

Audio & Sound Design

Dialogue cleanup, noise removal, multi-source sync, music beds, levelling and a mix that holds up on a phone speaker as well as a TV.

Motion Graphics & Titles

Lower thirds, animated logos, subtitles and on-brand title cards built in After Effects to your existing brand kit.

Delivery & Formats

Exports from 480p to 4K, aspect-ratio variants for every platform, burned-in or sidecar captions, and the project files handed back to you.
Why it matters for a videographer. Splitting a job across a cutter, a colorist and an audio freelancer costs you three briefs, three delivery dates and three chances for the look to drift. Running it through one video post production services team means one brief, one date and one person accountable for how the final film looks and sounds.

Portfolio

Our Video Editing Work

Films cut by our editors for videographers and studios across the United States, delivered under their brands rather than ours.

Who We Work With

Who We Edit For

Most of our clients are US professionals who shoot for a living and ran out of hours before they ran out of bookings. A few are brands who never had an in-house editor to begin with.

Wedding & Event Videographers

Our core client, and the reason we exist. A US peak season fills your calendar faster than you can edit it, and the queue starts eating the bookings you have not taken yet.

Studios & Production Houses

Teams who need overflow capacity without adding payroll, and who need it to look indistinguishable from their in-house work.

Creators & Channels

YouTubers and podcasters shipping on a fixed weekly schedule who need the edit to be somebody else’s problem.

Brands & Agencies

Marketing teams with footage sitting in a drive and a campaign date approaching. See how agencies use outsourced editing.

Wedding Outsourcing · United States

We Edit Weddings for US Videographers — Under Your Name

Most of what we edit is weddings. Most of our clients are US videographers and studios who outsource their wedding video editing to us, often a whole season at a time. You stay on set. We cut, grade and mix. The finished film goes out under your brand.

Your name, not ours

The couple never hears of Eterna Edits. No watermark, no credit, and no contact between us and your client. We will sign an NDA before you send us anything.

Busy season covered

US weddings all land in the same few months. We add editors when your season peaks, so you are not paying someone to sit idle all winter. How outsourcing works in the USA.

We learn your style once

On your first project we write down how you cut, grade and pick music. Every wedding after that gets the same treatment, whichever editor picks it up.

Prices are on this page

From $249 a film. Two revisions and the project files are included. The full list is further down the page, so you do not need a call to hear it.
New to outsourcing? Read in-house vs outsourced wedding video editing for studios, or see what outsourcing wedding video editing looks like from start to finish.

Delivery

Turnaround Times and What's Included

Almost nobody offering professional video editing services publishes a delivery window. We do, because it is the first thing you actually need to know before you can promise a date to your own client.

Published turnaround

Deliverable

First cut

Cinematic wedding highlight
From 7 days
Wedding short film
7–30 days
Documentary edit
7–30 days
Ceremony & reception reels
7–30 days
Brand, corporate, YouTube, social
Dated in your quote
Every project — wedding or not — gets a committed delivery date in writing with the quote, before you send a file.

Included in every project

The Process

How Our Video Editing Service Works

Five steps from upload to final file. Most of the work in our video editing service happens before the first cut — that is where style matching is won or lost.
01

Share the footage and the brief

Upload through Drive, Dropbox, WeTransfer or Frame.io. Send any reference films, LUTs, music choices and the moments you want protected.
02

We quote and commit to a date

You get a fixed price and a delivery date in writing. Nothing starts until you approve both.
03

We build your style guide

Pacing, grade, transitions, music handling and title treatment are documented once, then applied to every project you send after it.
04

Edit, grade and mix

The cut, the color and the sound are finished together rather than handed between people, so the film is consistent end to end.
05

Review, revise and deliver

Two revision rounds are included. Final files arrive white-labelled, in the formats you need, with the project files.

Why Us

Why Choose Eterna Edits for Professional Video Editing Services

Six things that decide whether outsourcing works or quietly costs you a client — and the questions worth asking any video editing company before you send them footage.

Your style, not ours

We document your pacing, grade, music handling and transitions as a style guide on the first project, then apply it to every one after. The goal is that your client cannot tell the edit changed hands.

Genuinely white label

Nothing we deliver carries our name. No watermark, no credit, no contact with your client. An NDA is available on request before you send a single file.

A team, not one editor

Capacity scales with your season. When one editor is unavailable, another picks the project up with the same style guide — your delivery date does not move.

A date you can resell

You get a committed delivery date in writing with the quote, so you can promise your own client a date instead of hedging.

Footage handled properly

Encrypted transfer, access limited to the editors on your project, and your project files handed back at the end rather than held hostage.

Industry-standard tools

We work natively in Adobe Premiere Pro, After Effects, DaVinci Resolve and Final Cut Pro — so the project opens cleanly on your machine.

Client Feedback

What Clients Say About Our Video Editing Company

Rated 4.4 out of 5 across 160 client reviews from the videographers and studios who send us work every season.
Rated 5 out of 5
“I was nervous about handing over a wedding I’d shot myself. The first cut came back paced the way I would have cut it, and the grade matched my other films. That almost never happens on a first project.”

Nico B.

Wedding videographer, Italy

Rated 5 out of 5
“We used them through our busiest season and nothing slipped. Having a delivery date we could actually quote to couples changed how we sold the whole year.”

Mason James

Studio owner

Rated 5 out of 5
“White label is the part that matters to me. My clients have no idea anyone else touched the footage, and the project files came back so I can still make changes myself.”

Jay R.

Videographer, Florida

Next Step

Ready to Clear Your Edit Queue?

Start with one project. Tell us what is waiting and you get a fixed price against our published rates, plus a delivery date you can promise your own client.

Published Price List

What We Charge to Edit a Wedding

Every wedding package we publish, at the same prices as our full pricing page. Each is priced per wedding rather than per hour, and covers one to seven cameras plus drone, two revision rounds, the project files and delivery from 480p to 4K. Brand, corporate, YouTube and social projects are quoted individually — an hour of multi-cam footage and a 60-second ad cutdown are not the same job, and no video editing service can honestly price both from one card.

Core wedding films

Cinematic Highlight

From$249

Most Popular

Cinematic Highlight

From$329

Short Film

From$329

Documentary Full Film

From$329

Combo packages — two or more films from one wedding

Cinematic Highlight + Documentary Full Film

From$550

Combining deliverables from a single wedding costs less than ordering them one at a time, because your editor organises, syncs and color-matches the footage once instead of twice. Take a further 5% off any combo package on top of the prices above. Need a pairing that is not shown, or a deliverable that is not listed? Ask for a fixed quote.
No hourly billing. You get a fixed price per project before any work starts, and that is the number you pay. A quote only goes above the published price for reasons we name up front — more footage or camera angles, a longer finished runtime, motion graphics beyond a title card, heavy audio repair, a rush deadline, or extra aspect-ratio versions. It never changes after the edit is delivered.

For Studios Shooting a Full Season

Free Edits When You Send Us a Season

Most editing studios discount a percentage. Eterna Edits gives whole projects back instead — on exactly the same published prices everyone else pays, with nothing to negotiate and nothing to track but the count.

6 + 1

20–50 weddings a year

For every 6 wedding projects you send us, the next one is edited absolutely free — same deliverables, same editor, same turnaround.
Send twenty weddings in a season and three of those edits cost you nothing.

10 + 2

50+ weddings a year

For every 10 wedding projects you send us, you get 2 edited absolutely free — the volume tier built for studios running multiple shooters.
Send sixty weddings in a season and twelve of those edits cost you nothing.
Offer terms. All projects in a cycle must be sent to us within 45 days. Beyond 45 days the free edit is no longer valid. Whether the 5% combo discount stacks with these volume offers is confirmed in your quote.

Proof

Wedding Films We Have Edited, Start to Finish

Four short write-ups of real projects — the footage we were handed, what we did with it, and what went back to the videographer under their own brand.
Challenging, unstable coverage stabilised and graded into a cinematic highlight.
Limited footage from a single day cut into a full six-minute highlight film.
Matching a videographer’s existing editing style so the handover was invisible.
Multi-camera footage from mismatched bodies unified into one consistent grade.

Questions

Video Editing Services FAQs

Eterna Edits offers wedding and event film editing, brand and corporate video, YouTube and long-form edits, social and short-form vertical cuts, and product and e-commerce video. Our video post production services also cover color grading, audio mix and sound design, motion graphics and multi-format delivery. Photo editing and retouching are available alongside the film.

Wedding films start at $249 and every wedding package price is published on our pricing page. Brand, corporate, YouTube and social projects are quoted individually because footage volume and runtime vary so widely. You always get a fixed price in writing before work starts — there is no hourly billing.

Cinematic wedding highlights are delivered from 7 days, and wedding short films and documentaries run 7–30 days depending on footage volume. Brand, corporate, YouTube and social projects get a committed delivery date in writing with the quote, before you send any files.

No. Every delivery is white label — no watermark, no credit and no contact between Eterna Edits and your client. An NDA is available on request before you send a single file.

That is the main thing we are hired for. On your first project we document your pacing, grade, music handling, transitions and title treatment as a style guide, then apply it to everything you send afterwards. Reference films and LUTs make the first cut land closer.

Google Drive, Dropbox, WeTransfer or Frame.io — whichever you already use. Transfers are encrypted and access is limited to the editors working on your project. You do not need to buy or learn new software to work with us.

Two rounds of revisions are included in every project at no extra cost, along with the project files so you can make your own adjustments later if you want to.

Adobe Premiere Pro, After Effects, DaVinci Resolve and Final Cut Pro. Project files are handed back in the format you work in, so the timeline opens cleanly on your own machine.

No. Wedding and event videographers are our largest group of clients, but our video editing company also works with studios, production houses, YouTubers, podcasters, e-commerce brands, marketing agencies and corporate teams.

Yes. Most of our clients are in the United States, and we also work with videographers and studios internationally. Our sales office is in Kalispell, Montana and our post-production studio is in Ahmedabad, India.

A freelancer is usually cheaper for occasional work and can be excellent. A video editing agency wins when your volume is seasonal or growing: capacity scales with you, your style guide is held by the team rather than one person, and if an editor is unavailable your delivery date does not move. If you shoot steady year-round volume, an in-house hire often beats both on cost per film.

Use the form below. Tell us what you shoot and roughly how much footage you have, and you will get a fixed price and a delivery date in writing. You can also email video@eternaedits.com or call +1 406-807-1850 directly.

Explore

More From Eterna Edits

Service pages, published pricing and guides from across the studio.
Cinematic highlights, short films and documentaries for US wedding videographers.
How white-label outsourcing works, what it costs and when it is worth it.
General outsourced editing for studios, brands and agencies.
Every wedding package price, up front, with no call required to hear it.
Work with a dedicated editor who learns and keeps your signature style.
An honest look at the market, including who we compete with.

Start Here

Get a Fixed Price and a Delivery Date in Writing

Tell us what you shoot and how much footage is waiting. You will get a fixed price against our published rates and a committed delivery date, both in writing, before you send a single file. The quote is free and it does not need a call.
Or reach us directly: video@eternaedits.com · +1 406-807-1850
Scroll to Top